• Skip to primary navigation
  • Skip to content
Pelican Fish

Pelican Fish

  • About
  • Services
  • Projects
  • Our Clients
  • Contact Us

CONSTRUCTION PROGRESS UPDATE – ARMADALE ALTERATIONS/ADDITIONS

13 October, 2017 by admin

The bathrooms at our Armadale addition are ready for the installation of the 3.0×1.5m porcelain panels by ‘Maximum’. This is an extremely specialized tiling field and the guys at MCM tile and stone are doing a terrific job with their professionalism and can do attitude. We can’t wait to see the finished result.

Filed Under: News

© 2026 Pelican & Fish Associates
Developed by Grey Neuron